Stage 0

Engagement

Engagement Header
OwnerArcestra Commercial
0.1

Engagement Identification

The governing charter this onboarding maps to.
Gates which permissions and actuation rights exist across the platform. Enforced by the Guardrail Engine.
Stage 1

Business & Financial

The Economic Reality
OwnerArcestra Commercial ↔ Channel Partner
StandardsISO 50006ISO 17741GHG ProtocolIPMVPGreen Button
1.1

Client & Corporate Structure

Add a row per facility to map the multi-site portfolio.
1.2

Utility Providers & Contracts

Add one per resource (electricity, water, gas, district energy, fuel, steam).
1.3

Financial Baseline · Utility Bills (Critical)

Critical
Minimum 12 months per resource required before baseline lock.
Metered telemetry must be cross-checked against billed consumption before baseline lock. A discrepancy greater than plus or minus 2 percent triggers a data-quality investigation.
1.4

Economic Model & Business KPIs

e.g., trailing 12 months, or a normalized reference year.
1.5

Business Objectives & Outcomes

Link each agreed business outcome to the KPI that evaluates it.
Rank objectives and define success per objective.
Handoff gateStage 1 is ready when the Pilot Charter, the Economic Model, and the 12-month utility bill set are signed off.
Stage 2

Facility & Digital Twin

The Physical Reality
OwnerImplementer / Field Integrator (with Arcestra L3 guidance)
StandardsProject HaystackBrickIFC / BIMASHRAE TC 9.9The Green GridISO/IEC 30134EN 50600
2.1

Facility Identification & Geolocation

Critical for cooling-efficiency interpretation.
2.2

Physical & Logical Topology (Digital Twin Hierarchy)

Org → Portfolio → Site → Building → Data Center / Zone → System → Equipment → Sensor / Point. This is the digital twin skeleton.
2.3

Electrical Topology (Single-Line Relationships)

Precisely where IT energy is measured (PDU output, rack input). This is the PUE denominator and must be explicitly agreed.
2.4

Mechanical / Cooling Topology

Hot/cold aisle, containment type.
Flow, temperature, quality sensors.
2.5

Asset Condition & Lifecycle

Add one per critical asset or system. Condition is contextual, not a performance conclusion without telemetry.
2.6

WAGES Utility Sub-Metering Inventory

Water, Air, Gas, Electricity, Steam. Add one per meter.
2.7

BMS / DCIM Integration & Protocol Discovery

e.g., Niagara, Metasys, EcoStruxure, PI, Nlyte.
2.8

External & Environmental Context

Handoff gateStage 2 is ready when the digital twin hierarchy is populated, the IT-load boundary is signed off, and the WAGES meter inventory is complete.
Stage 3

Governance & Interaction

The Operational Reality
OwnerArcestra + Channel Partner + Implementer (joint, with client)
StandardsITIL 4IEC 62443ISO 27001PMBOKRACIIPMVP
3.1

RACI Matrix (Agnostic Roles)

Reference RACI matrix
ActivityArcestra (Vendor)Channel PartnerImplementerClient
Economic model & KPIsA/RCIC
Client business data collectionCA/RIC
Facility / digital-twin captureCCA/RC
BMS integration & connectorsACRC
Data flow agreement & security sign-offRCCA
Baseline definition & Day-30 lockA/RIIC
L1 / L2 supportIA/RR·
L3 / backline supportA/RII·
R = Responsible, A = Accountable, C = Consulted, I = Informed
3.2

Interaction & Handoff Rules

3.3

Data Flow Agreement & Data Sovereignty

Actuation boundaries and data flow governed by the Guardrail Engine and client-approved policies.
3.4

Baseline Governance (IPMVP-Aligned)

3.5

Support & Escalation Model (ITIL-Aligned)

3.6

Operational Context & Constraints

Handoff gateStage 3 is ready when the RACI is signed, the Data Flow Agreement is approved, and the security sign-off is complete.
Stage 4

Identity, Access & Security

The Access Reality
OwnerClient Tenant Admin + Partner + Arcestra Administration (distributed)
StandardsOIDC + MFAIEC 62443ISO 27001RBAC
4.1

Reference: Roles, Scope & Permissions

4.1 Six principal role families
#Role FamilyWho They ArePrimary Need
1End User (Client Business)Client executives, ESG leads, finance, leadershipOutcomes, KPIs, savings, ESG
2Operator (Client Operations)Facilities, data center, site operations teamsOperational detail, alerts, recommendations, execution status
3Partner (Master Channel)Master commercial partner reselling the platformClient-book visibility, sub-partner management, commercial metrics
4Sub-Partner (Reseller / Integrator)Downstream partner under the master partnerVisibility only over assigned sites
5Account Manager (Arcestra)Arcestra's named account ownerClient health, usage, support, relationship
6Arcestra AdministrationArcestra internal platform operatorsFull platform administration, billing, compliance, security
4.2 Scope hierarchy (one level granted, inherits below, nothing above)
ScopeDefinitionTypical Holder
L0 · PlatformAll tenants, all facilities, internal onlyArcestra Administration
L1 · Account GroupA set of assigned client accountsAccount Manager
L2 · Partner PoolAll clients & sites under one master partnerPartner
L3 · Sub-PartnerOnly sites assigned by the master partnerSub-Partner
L4 · Tenant / CompanyOne entire client organizationClient Tenant Admin
L5 · PortfolioA subset of the client's sitesEnd User (leadership), Operator lead
L6 · Site / FacilityOne building or data centerSite Operator, Site End User
L7 · SystemOne subsystem (cooling loop, power chain)Specialist Operator
L8 · Point / EquipmentIndividual sensor or assetDiagnostics / maintenance
Isolation rule: a request above or outside granted scope returns a hard 403 at the API/data layer, never a hidden UI element.
4.3 Permission model
PermissionMeaningAutonomy-governed?
VIEWRead dashboards, telemetry, reports, KPIsYes
ANALYZEDrill-down, custom queries, export data / reportsYes
ACKNOWLEDGEAcknowledge alerts, add notes, route to a humanYes
APPROVEApprove / reject an AI recommendation before executionRequired for Guided; pre-approved in Autonomous; N/A in Advisory
CONFIGUREModify thresholds, guardrails, policies, setpointsPer agreed Autonomy level
ADMINISTERManage users, roles, billing, tenants, connectorsNo at client level; yes within Arcestra
4.6.3

Tenant-Level Capture (per client organization)

Minimum one. Owns user provisioning for the client's End Users and Operators.
Affects what admin roles can access remotely.
Gates which permissions and execution rights are available.
4.5

Licensing & Seat Reconciliation

Included seats per site: 5 total · 3 Viewer + 1 Analyst + 1 Admin. Additional seats are billable per tier. Any roster exceeding included seats triggers a commercial confirmation before accounts are activated.
4.6

User Roster · Onboarding Data Collection Template

Capture identity (4.6.1) and role-specific detail (4.6.2) for every user. MFA is mandatory; the platform refuses to start without it.
4.9

Access Layer Readiness Gate

Handoff gateStage 4 is ready when the Tenant Admin is enrolled (SSO+MFA), the roster is provisioned (role / scope / seat), RBAC is enforced, and the provisioning audit trail is active. Stage 4 is a HARD GATE: telemetry ingestion cannot begin until it is green.
Gate

Cross-Stage Readiness & Export

The Unified Readiness Gate
R

Readiness Gate

Stages 1 to 3 may run in parallel. Stage 4 is a hard gate: telemetry ingestion cannot begin until the roster is provisioned and RBAC is enforced, because every reading, approval, and configuration action from Day 1 must be attributable to a scoped, authenticated identity in the tamper-evident audit ledger.
Overall onboarding status
NOT READY
S

Submit to Arcestra

Send your completed intake to the Arcestra team. They are notified the moment you submit and will follow up to confirm next steps. You can still download or print a copy below for your records.
E

Export the Onboarding Record

Progress autosaves to this browser. Export the full record to hand off, or print a clean summary for the onboarding pack.
Saved