Go deep.
For data centers, where AI demand drives cost fastest.
Priced per megawatt, from $1,000 per MW per month.
Most operators manage the total on the invoice. The drivers sit in the power, cooling and water systems behind it.
415 terawatt hours. Electricity used by data centers worldwide in 2024, about 1.5% of the global total.
IEA · Energy and AI · Apr 2025945 terawatt hours. Projected by 2030.
IEA · Energy and AI · Apr 2025From 4.4% to 12%. US data centers' share of national electricity, 2023 to as much as 12% by 2028.
LBNL via US DOE · Dec 2024Average facility efficiency (PUE) has barely moved for six straight years.
Uptime Institute · Global Survey 2025Arcestra maps it, prices it, and turns it into profit.
See the engine ↓For data centers, where AI demand drives cost fastest.
Priced per megawatt, from $1,000 per MW per month.
For enterprise portfolios: branches, campuses, retail, offices. One view across every site, no new hardware.
A saving only counts once it's measured against a locked baseline and sealed as evidence. That's how Arcestra reports it.
How we verify →
Savings certificate
Illustrative
Verified saving
Curated signals from live sources, scored for data center operators
Live view of power, cooling and airflow, with fixes ranked by impact.
Verified dollar impact and board-ready reporting.
Evidence-grade energy and water records for disclosure.
Arcestra connects to the building management, metering and IT systems already in place.
No. Arcestra connects to the building management, metering and IT systems already in place, over the protocols they already speak, like BACnet, Modbus, SNMP and MQTT. No rip and replace.
No. People decide. Arcestra recommends each fix with its expected impact, and your team approves every change before it goes ahead, with two-person sign-off and a full audit trail.
Every saving is measured against a baseline locked before the change, then sealed as evidence. The result is a certificate a CFO, board or auditor can check.
Arcestra DC is built for data centers: colocation, enterprise and hyperscale. Arcestra EO is built for enterprise portfolios: branches, campuses, retail and offices.
Arcestra DC is priced from $1,000 per MW per month, and the break-even calculator shows what it would need to save to pay for itself. Arcestra EO is priced per site.
Monthly insights on data center resource economics, operational control, and the infrastructure decisions that separate leaders from laggards.
