Go deep.

For data centers, where AI demand drives cost fastest. Priced per megawatt.

Book a demo Run your numbers ↓
A Who it's for

Colocation, enterprise and hyperscale.

Arcestra DC works across colocation, enterprise and hyperscale facilities.

01

Colocation

Many tenants share one power and cooling plant.

02

Enterprise

One owner runs the building and the IT inside it.

03

Hyperscale

Many large halls, built to one design, across a campus.

B What it watches

Power, cooling, water and compute.

Arcestra reads the meters, sensors and controls you already run, then finds the drift, the overcool and the idle load.

Power signalsRead from the systems already in place
Utility feed
UPS output
PDU branch circuits
Rack power
C ROI

Run your own numbers.

Arcestra DC is priced from $1,000 per MW per month. How much would it need to save to pay for itself? Put in your facility and see.

Your facility · example inputs, change them
MW
ratio
$per kWh

Assumes the IT load runs around the clock. Facility energy = IT load × PUE × 8,760 hours.

Arcestra pays for itself if it trims 1.1% of your energy bill.

Facility energy per year
131.4 GWh
Energy bill per year
$10,512,000
Arcestra per year, at $1,000 per MW per month
$120,000
Every 1% you save is worth
$105,120 a year
See what your site can save

Your Data Center is Burning Cash, We Fix That.